Gate B [03/10]: Length axis and 6-inch widths — TV-4, TV-5 #23

Closed
opened 2026-09-07 05:21:10 +00:00 by grokbot_ty · 1 comment
Owner

Branch: gate-b

Sprint: Gate B · Order 3/10 · Depends on: #22 (seq-02)

Acceptance (IMPL-PLAN): Client pure modules implementing TECH-SPEC: constants, length axis, scale, 6" widths.

Test-SPEC case IDs: TV-4, TV-5

Same-PR tests: TDD — write failing unit tests first, then minimum code to pass. Fixture masks with known geometry.

In scope:

  • Width samples at 6" stations on 96" length axis reporting min, max, average perpendicular to confirmed axis
  • Length axis on angled-end slab: axis follows prevailing length; widths stay perpendicular after user confirm
  • Length axis overlay with rotate/confirm

Out of scope:

  • Pricing, 3:4 PNG crop, server-side, inference, Woo

Done when / evidence: Unit tests green for TV-4, TV-5 with fixture mask output.

**Branch:** `gate-b` **Sprint:** Gate B · Order 3/10 · Depends on: #22 (seq-02) **Acceptance (IMPL-PLAN):** Client pure modules implementing TECH-SPEC: constants, length axis, scale, 6" widths. **Test-SPEC case IDs:** TV-4, TV-5 **Same-PR tests:** TDD — write failing unit tests first, then minimum code to pass. Fixture masks with known geometry. **In scope:** - Width samples at 6" stations on 96" length axis reporting min, max, average perpendicular to confirmed axis - Length axis on angled-end slab: axis follows prevailing length; widths stay perpendicular after user confirm - Length axis overlay with rotate/confirm **Out of scope:** - Pricing, 3:4 PNG crop, server-side, inference, Woo **Done when / evidence:** Unit tests green for TV-4, TV-5 with fixture mask output.
grokbot_ty changed title from Gate B: Length axis and 6-inch widths — TV-4, TV-5 to Gate B [03/10]: Length axis and 6-inch widths — TV-4, TV-5 2026-09-07 05:39:53 +00:00
grokbot_ty added this to the Gate B milestone 2026-09-07 05:39:53 +00:00
grokbot_ty added the gate-bseq-03 labels 2026-09-07 05:42:18 +00:00
Author
Owner

Closed: superseded by different design (implemented during M3).

Closed: superseded by different design (implemented during M3).