ts phase decision why evidence result
|
|
2026-09-09T19:43:56Z harness ran check-structure.sh on untouched main tip capture red baseline before structure edits docs/checks/check-structure.sh FAILED as expected (red baseline)
|
|
2026-09-09T19:43:56Z frame done predicate is check-structure.sh exit 0 with lock phrases intact falsifiable gate for structure pass .audit/docs-structure-pass.tsv open
|
|
2026-09-09T19:45:25Z unit AGENTS ownership complete; Gates table removed; UX-DESIGN demoted; IMPL-PLAN owns gate meanings subtract calendar restatement and close ownership gap AGENTS.md,docs/UX-DESIGN.md,docs/IMPL-PLAN.md check-structure PASSED
|
|
2026-09-09T19:45:25Z unit TEST-SPEC and deploy docs label missing tree as Phase 0 targets stop agents inventing harness paths that are not on main docs/TEST-SPEC.md,docs/DEPLOYMENT.md,deploy/docker-compose.yml,README.md check-structure PASSED
|
|
2026-09-09T19:45:25Z verify ran docs/checks/check-structure.sh after all edits prove done predicate on real artifact docs/checks/check-structure.sh exit 0 VERIFIED
|
|
2026-09-09T19:47:17Z attention-fix restored Gate B meaning to original AGENTS wording; hardened check-structure for both deploy files and fuller math lock phrase Attention review flagged Gate B parenthetical as lock drift and weak deploy grep docs/IMPL-PLAN.md,docs/checks/check-structure.sh check-structure PASSED
|