86 lines
4.6 KiB
Markdown
86 lines
4.6 KiB
Markdown
# Daily — 2026-09-10
|
||
|
||
> Focus-coach log. Written by the mentor from Tony's 21:00 check-in — he answers three
|
||
> questions and does not maintain this file. See [[04_Daily/README|04_Daily]].
|
||
|
||
| | |
|
||
|---|---|
|
||
| Block | did not exist yet — opens 2026-09-11 |
|
||
| Ball moved | **no** — setup day |
|
||
| Closed | nothing on Thornhill |
|
||
| Gym | not started (begins 2026-09-11) |
|
||
| Drift flags | 1 |
|
||
|
||
**Tony's words at the check-in:** *"Day one. We begin tomorrow."*
|
||
|
||
Logged as it is, with the zeros showing. Today was not a work day and was never meant to be — there
|
||
was no block to open. Saying "no" honestly on day zero is the point of the log; inflating a setup
|
||
day for the sake of a green first entry would ruin the only thing it's for.
|
||
|
||
## Decided today
|
||
|
||
- **Gym: 07:30 AM, Monday–Friday.** Firm. Home ~09:00. Logged as an anchor, not a tracked goal
|
||
— the WIP limit of one applies to projects.
|
||
- **Work block: 2 full hours per day, every day, on the active item only.** Opens on Tony's
|
||
arrival-home text (a real event, not a clock time a long gym session can invalidate).
|
||
28 block hours available before 2026-09-24.
|
||
- **Deadlines set firm:** 2026-09-24 Thornhill live; 2026-10-10 Veripath binary call.
|
||
- **Parked:** "deep sea harness" — correct name **DeepSeek Harness (`dsh`)**, an MIT-licensed
|
||
open-source agent harness from DeepSeek (v0.1 dev preview, released 2026-08-13). Tony
|
||
deferred it himself in the same breath he raised it. Researched at his request and filed in
|
||
the mentor's notes; remains parked.
|
||
- **Weekends:** playing it by ear through 2026-09-13. Floor is 1–2 hours of work Saturday,
|
||
no gym.
|
||
|
||
## Correction to the plan — mentor read the vault
|
||
|
||
Two things the onboarding baseline had wrong:
|
||
|
||
1. **The Thornhill site is already written and signed off** (2026-08-30, SEO pass with Leonard).
|
||
The blocker is not content — it is a **deployment decision**. DNS for thornhillconstruction.net
|
||
resolves to `162.255.119.233`, not the VPS (`74.208.111.99`); going live on the VPS needs root.
|
||
Options: Cloudflare Pages / Netlify (no root, auto-redeploy on push) or a `*.afterthedemo.com`
|
||
preview. Also outstanding: **Yelp carries a wrong number (530-344-1504)**, **Google Business
|
||
page not listed**, NAP consistency across listings.
|
||
2. **Phoenix Salon + Spa is not a separate project** — it is Veripath's current active client
|
||
(Ashley, Cameron Park). It was logged earlier today as "queued next-up," which was the wrong
|
||
frame; it is live client work.
|
||
|
||
## Consequence
|
||
|
||
If the site is already written, the 14-day finish line is closer to **6–8 hours** of work than
|
||
28. That frees block time for **Veripath** — the project Tony raised today as overwhelming him.
|
||
A plan that parked Veripath until Oct 10 with zero scheduled hours was always going to feel bad
|
||
on Oct 10.
|
||
|
||
## Drift
|
||
|
||
- 1 flag: "deep sea harness" volunteered unprompted mid-conversation. **Tony self-corrected
|
||
before the mentor had to** ("But I need to complete these important projects first"). Logged in
|
||
`coaching/drift-log.md`. That is the target behaviour, not a failure.
|
||
|
||
## Open
|
||
|
||
- Deployment path decision — genuinely Tony's call (DNS + credentials).
|
||
- Is Larry's `Larry@ThornhillConstruction.net` actually wired, and does the contact form submit
|
||
to it? Not confirmed in the vault.
|
||
- Weekend block trigger — unset by choice this week.
|
||
- Veripath: what does the 2026-10-10 call actually decide? Not defined yet.
|
||
|
||
## Update — later the same day
|
||
|
||
Tony corrected the mentor: **the site is live.** It is on WordPress + Contact Form 7, not static
|
||
HTML. Verified by loading the live page: phone 530-306-4629 ×3, CSLB #336956 ×3, 11 images none
|
||
broken, mailto correct, old wrong number absent from the site. His estimate: ~85% finished.
|
||
|
||
**The mentor was wrong about the deployment blocker, and the cause is worth recording:** it read a
|
||
stale `status.md` (last touched 2026-08-31) and published it as current. Tony's own baseline rule
|
||
is *"his word is the source."* A vault file is a claim with a date on it, not ground truth. The
|
||
vault status file has been corrected so the next agent doesn't repeat it.
|
||
|
||
Revised remaining work, in order: (1) verify the contact form actually delivers to Larry's inbox —
|
||
highest value, ~15 min, and unverified; (2) create the Google Business page — not listed; (3) fix
|
||
Yelp's wrong number 530-344-1504; (4) expand the copy, which is thin at ~900 visible characters;
|
||
(5) more photos, gated on Larry; (6) ~~remove the stray 🐴 from the `<title>` tag~~ — **corrected 2026-09-11: false alarm, that was the mentor's own browser tool; the site title is clean.** **Nothing is
|
||
blocked on DNS, root, or hosting.** ≈4–6 hours of real work.
|