4576df7253
Drop the Gate B parenthetical that was not in the frozen AGENTS table. Require Phase 0 labels in both compose and DEPLOYMENT, and pin the full client-authoritative math lock phrase.
1.3 KiB
1.3 KiB
| 1 | ts | phase | decision | why | evidence | result |
|---|---|---|---|---|---|---|
| 2 | 2026-09-09T19:43:56Z | harness | ran check-structure.sh on untouched main tip | capture red baseline before structure edits | docs/checks/check-structure.sh | FAILED as expected (red baseline) |
| 3 | 2026-09-09T19:43:56Z | frame | done predicate is check-structure.sh exit 0 with lock phrases intact | falsifiable gate for structure pass | .audit/docs-structure-pass.tsv | open |
| 4 | 2026-09-09T19:45:25Z | unit | AGENTS ownership complete; Gates table removed; UX-DESIGN demoted; IMPL-PLAN owns gate meanings | subtract calendar restatement and close ownership gap | AGENTS.md,docs/UX-DESIGN.md,docs/IMPL-PLAN.md | check-structure PASSED |
| 5 | 2026-09-09T19:45:25Z | unit | TEST-SPEC and deploy docs label missing tree as Phase 0 targets | stop agents inventing harness paths that are not on main | docs/TEST-SPEC.md,docs/DEPLOYMENT.md,deploy/docker-compose.yml,README.md | check-structure PASSED |
| 6 | 2026-09-09T19:45:25Z | verify | ran docs/checks/check-structure.sh after all edits | prove done predicate on real artifact | docs/checks/check-structure.sh exit 0 | VERIFIED |
| 7 | 2026-09-09T19:47:17Z | attention-fix | restored Gate B meaning to original AGENTS wording; hardened check-structure for both deploy files and fuller math lock phrase | Attention review flagged Gate B parenthetical as lock drift and weak deploy grep | docs/IMPL-PLAN.md,docs/checks/check-structure.sh | check-structure PASSED |