Commit Graph

3 Commits

Author SHA1 Message Date
Ty 92d1a7ec5e docs(m1): plan of record — TDD card breakdown, UAT deployment, fixtures, worker dispatch
- docs/M1-POR.md: scope, TDD method, 6-card breakdown, deployment POR,
  test plan, real-slab fixtures, dev/QA worker dispatch (.202:8081 text,
  .202:8082 vision; one task per endpoint)
- docs/CAPTURE.md: input photo (JPEG + HEIC fallback), 200KB soft goal
- deploy/README.md: Milestone 1 UAT deployment POR (one container, LAN URL)
- tests/fixtures/: 3 black-sheet slab photos + calibration records
  (152422 28x2.25 irregular, 155818 21x1.75, 155754 21x1.75)
2026-09-13 22:37:19 -07:00
Ty 566ea0675c docs: mark leftover compose as pre-Milestone 1 2026-09-11 15:06:24 +00:00
Ty 47abad22bc docs: Milestone 1 deploy is a Docker image; host is runtime 2026-09-11 15:06:00 +00:00